What is a BIM Execution Plan (BEP)? What it includes and how to prepare it

When a project is delivered with BIM, saying “we’ll do it in BIM” isn’t enough. You need to agree on who models what, with which software, with how much information, when it’s delivered and how it’s reviewed. That agreement is written down in the BIM Execution Plan, or BEP.

What is a BEP?

The BIM Execution Plan (BEP; Plan de Ejecución BIM or PEB in Spanish) is the document that defines how BIM information will be managed on a specific project. It is prepared by whoever delivers the work (the design firm, consultant or contractor) in response to the client’s requirements, and the client reviews and approves it.

Put simply, it’s the project’s “playbook”: every participant knows what is expected of them and how work is coordinated across disciplines.

What is it for?

  • Aligning expectations between client and team before modeling starts.
  • Defining responsibilities: who produces each model and who reviews it.
  • Organizing deliveries: what is delivered, in what format and when.
  • Avoiding rework: modeling only what’s needed, at the level of information each stage requires.
  • Enabling verification: every delivery is checked against what the BEP commits to.
Illustration: without a BEP each discipline works on its own and clashes appear; with a BEP everyone follows the same plan and the model is coordinated

Pre-appointment BEP and detailed BEP

Under the ISO 19650 series, the BEP is developed at two points:

  • Pre-appointment BEP: submitted with the tender. It shows how the team will meet the client’s requirements and what capabilities it has.
  • Detailed (post-appointment) BEP: developed at the start of the contract. It turns the proposal into detail: final team, responsibility matrix, delivery schedule and coordination procedures.

And it isn’t a static document: it is updated during the project when the team, scope or stages change.

Diagram: how the BEP is used, from the client's requirements to the review and approval of each delivery

What does a BEP include?

Every project is different, but a complete BEP usually covers the following:

SectionWhat it defines
Project informationName, location, stages, participants and BIM scope.
BIM goals and usesWhat the models will be used for: coordination, quantity take-off, design review, simulation, etc.
Roles and responsibilitiesWho models, who coordinates and who manages information, with a responsibility matrix.
Software and formatsPrograms and versions, and exchange formats such as IFC.
Common data environmentWhere information is shared and how each file is reviewed and approved.
Structure and namingHow models are split and how files and elements are named.
Level of informationWhat detail and data each element must have at each delivery (see what LOD is).
Delivery planWhat is delivered, in what format and at which project milestones.
CoordinationHow often clash reviews and coordination meetings take place.
Quality controlHow models are checked for compliance before each delivery.

The BEP in Chilean public projects

In Chile, Planbim’s BIM Standard for Public Projects sets the BEP as the supplier’s response to the public client’s BIM requirements. If your company bids for tenders with BIM requirements, the BEP is what shows your team knows how to comply. We help with that through our BIM advisory for public projects.

Common mistakes when preparing a BEP

  • Copying a generic BEP from another project without adapting it to the real requirements.
  • Committing to more than the team can deliver in BIM uses, timelines or level of information.
  • Not assigning named owners and roles for each model and each review.
  • Leaving out quality control, so errors only surface during the client’s review.
  • Not updating it when the project changes.

Quick checklist before submitting your BEP

  1. Does it respond point by point to the client’s requirements?
  2. Does each BIM use have a clear goal?
  3. Does every model and every review have an owner?
  4. Are software, versions and exchange formats defined?
  5. Does the delivery plan match the contract milestones?
  6. Does it explain how coordination and quality control are done?

Frequently asked questions

Are PEB and BEP the same thing?

Yes. PEB is the Spanish acronym for Plan de Ejecución BIM; BEP is the English acronym for BIM Execution Plan.

Who prepares the BEP?

The team delivering the work prepares it, usually led by its BIM coordinator or manager, and the client approves it.

When is it delivered?

A first version accompanies the tender, and the detailed version is agreed at the start of the contract. It is then updated throughout the project.

Does a private project also need a BEP?

It’s highly recommended. Even when no standard requires it, it organizes work across disciplines and prevents disputes over what was supposed to be delivered.

Sources and references

  • ISO 19650-1:2018. Information management using building information modelling — Part 1: Concepts and principles. iso.org
  • ISO 19650-2:2018. Part 2: Delivery phase of the assets (defines the pre-appointment and post-appointment BEP). iso.org
  • Planbim (Corfo). Estándar BIM para Proyectos Públicos: intercambio de información entre mandante y proveedores (BIM Standard for Public Projects, Chile).
  • Computer Integrated Construction Research Program, Penn State University. BIM Project Execution Planning Guide. bim.psu.edu

Need to prepare or review your project’s BEP? BIM LAB supports you with BIM Execution, BIM Implementation and team training at our Academy (in Spanish).

¿Quieres llevar esto a tu proyecto?

Te ayudamos a implementar BIM, desarrollar tus modelos o capacitar a tu equipo.

← Volver a Novedades

Puedes volver al Grupo Bim Lab o visitar otras Unidades de Servicios BIM.

Grupo Bim Lab

Unidades BIM

Somos una organización de profesionales y empresas unidas para prestar los mejores servicios en metodologías BIM

Formación

Unidad de Formación BIM

Implementación

Unidad de Implementación BIM

Comunidad

Comunidad de Usuarios BIM

Logo-principal-Blanco.png