When a client asks for a BIM model, the key question isn’t just “what gets modeled?”, but “with how much detail and how much confidence?”. That’s what LOD answers.
What does LOD mean?
LOD stands for Level of Development. It describes how fully the geometry and information of a model element are defined and, therefore, how much the people who use it to design, quantify, coordinate or build can rely on it.
LOD is often translated as “level of detail”. The difference matters: an element can look highly detailed and still not be defined or validated. The level of development focuses on the reliability of the information, not just its appearance.
The most widely used reference for defining the levels is the LOD Specification published by BIMForum, which describes what each type of element must meet at each level.
The LOD levels, one by one
| Level | What it represents | Example: a wall |
|---|---|---|
| LOD 100 | Conceptual or symbolic representation. Used for early massing or area studies. | A mass showing where the wall will go. |
| LOD 200 | Generic element with approximate size, shape and location. | A wall with approximate thickness and no defined materials. |
| LOD 300 | Specific element with defined dimensions, shape, location and orientation. Quantities can be measured directly. | A wall with real thickness, defined materials and exact location. |
| LOD 350 | Like LOD 300, plus the interfaces with other systems needed for coordination. | A wall with MEP penetrations, supports and junctions with other elements. |
| LOD 400 | Element with enough information for fabrication, assembly and installation. | A wall with layer details, fixings and parts for fabrication or assembly. |
| LOD 500 | Field-verified element: it represents what was actually built. | The wall as built on site, for the final or as-built model. |
LOD 500 is a special case: it doesn’t mean more detail than LOD 400, but that the element has been verified on site. That’s why it is usually associated with the final models handed over for building operation.
LOD, LOG and LOI are not the same
- LOG (Level of Geometry): how much geometric detail the element has.
- LOI (Level of Information): how much non-graphic information is attached to it, such as manufacturer, code, strength or maintenance.
- LOD: combines both aspects and expresses how reliable the element is at a given project stage.
The ISO 19650 series and EN 17412-1 use the concept of Level of Information Need: instead of asking for one LOD number for everything, you define which geometric information, data and documentation are needed for each purpose and each delivery. In Chile, the BIM Standard for Public Projects defines the required information through its own tables, linked to the project’s BIM uses.
Why is it important to define LOD?
- It avoids over-specifying: modeling everything at LOD 400 from schematic design is costly and adds nothing.
- It avoids under-delivering: if the model will be used for quantities or coordination, it needs a level that supports that.
- It aligns expectations: client and designers know what is delivered at each stage.
- It makes review possible: with defined levels, the model can be audited against what was agreed.
How is LOD defined on a project?
LOD is defined per element and per stage, according to how the model will be used. It is usually set out in a level of development matrix within the BIM Execution Plan (BEP): a table that shows, for each element type and each delivery, the level it must reach and who is responsible.
A good practice is to start from the question “what will we use the model for at this stage?” and define the minimum level needed from there, not the other way around.
Frequently asked questions
Does a complete model have a single LOD?
No. LOD is assigned per element: in the same delivery, the structure can be at LOD 300 and the furniture at LOD 200.
What LOD is needed for quantity take-off?
To get reliable quantities from the model, the elements being measured should be at least at LOD 300.
What LOD do I need to coordinate disciplines?
Clash coordination usually requires LOD 300 or higher, and LOD 350 when junctions and penetrations between systems need to be resolved.
Need to define the levels of development for your project, or check whether a model meets what was agreed? BIM LAB can help with BIM Execution, and our Academy offers training (in Spanish).